-
Transparency
This is one of our key values. For that reason, at every stage of implementation, we take care of maintaining close cooperation based on clearly defined rules; we also adapt to client’s needs and capabilities.
-
Sensitivity to Client’s Needs
Before we start implementing STABILIS MES in your company, we will carry out a detailed needs analysis with you, after which you will receive clear information on the costs and implementation methods, and together we will determine the principles and cost of system development and maintenance.
-
Support
This is our goal. Thanks to technology and experience, we are able to reduce the time needed to get to know your needs and identify processes that should be optimized with STABILIS MES.
Implementation of STABILIS MES in 8 steps:
-
1.
Needs analysis
At the beginning, you describe your needs and problems to us, and we help you determine what functions of STABILIS MES will work best for you.
-
2.
Audit
In the next step, we conduct an operational and functional audit in your factory to indicate areas of efficiency improvement in which the implementation of STABILIS MES will bring the greatest business and financial benefits.
-
3.
Designing functionality
Based on the analysis of needs and an audit, we design STABILIS in such a way that it exactly meets your needs.
STABILIS is not a ready-made product. The system’s capabilities are huge and it is configured individually for each implementation.
-
4.
Implementation schedule
When the project is ready and approved by you, we can prepare the implementation schedule. At this stage, the most important thing is that the schedule is best suited to your needs.
-
5.
Offer and signing the contract
Once we have established the functional design of the system and the schedule, we are ready to start preparing the Offer. After you accept it, we sign the contract and get to work.
-
6.
Implementation and tests
Now comes the stage everyone is waiting for. We implement STABILIS in your company and you can enjoy the benefits of it. Most importantly, we don’t stop production during implementation.
-
7.
Training
When STABILIS is ready to work, we start training all employees indicate by you on ho to use it. We want it to be well known and liked by people working with him.
-
8.
Consultation and maintenance
After completing the implementation, we do not need to finish cooperation. We are open to long-term partnership, system development and continuous improvement of your factory’s efficiency.